Pickit Logo
2.3

First steps

  • Quick start
  • Installing your Pickit system
    • Components
    • Connecting the cables
    • Testing your setup
    • Installing the Pickit calibration plate
  • Video tutorials
  • Downloads

Documentation

  • Web interface
  • Configuration
  • Setup
  • Detection
  • Picking
  • Settings
  • Snapshots
  • Calibration
  • Frequently Asked Questions
  • Support
  • Release notes

Robot integrations

  • ABB
  • Fanuc
  • Hanwha
  • KUKA
  • Omron TM
  • Siemens PLC
  • Stäubli
  • Universal Robots
  • Yaskawa
  • Robot-independent

Hardware

  • Processor
  • M camera
  • M-HD camera
  • L camera

Examples

  • Examples
  • Exercises
Pickit
  • »
  • Installing your Pickit system

Warning

You are reading the documentation for an older Pickit release. Documentation for the latest release (2.4) can be found here.

Installing your Pickit system¶

  • Components
  • Connecting the cables
    • Connect the power cable
    • Connect the camera
    • Connect a computer
    • Connect the robot or machine controller
  • Testing your setup
  • Installing the Pickit calibration plate
    • Preparation
    • Installing the Pickit calibration plate on the robot flange
    • Installing the Pickit calibration plate on a tool changer
Next Previous

© Copyright 2020, Pickit N.V..

Built with Sphinx using a theme provided by Read the Docs.
Other Versions v: 2.3
Versions
1.10
2.0
2.1
2.2
2.3
2.4